Henan K-Home Steel Structure Co., Ltd.

Prefabricated Workforce Lodging Prefab Steel House

Product Details:
Place of Origin: Henan, China
Brand Name: KHOME
Certification: CE, ISO, SGS, PVOC
Model Number: KHPSH
Payment & Shipping Terms:
Minimum Order Quantity: 300 square meters
Price: USD30/m2~USD45/m2
Packaging Details: Loaded into 40ft shipping container
Delivery Time: 30 days
Payment Terms: L/C, T/T
Supply Ability: 30000 square meters/month
  • Detail Information
  • Product Description

Detail Information

Features: Lower Cost Material: Sandwich Panel+Steel Structure
Usage: Warehouse, Dormitories, Temporary Offices, Workshop Manufacturer: Yes
Type: Temporary House Fire Proof: A1grade Fire Proof
Wind Pressure: Anti 100km/H Lifespan: 10~15 Years
OEM: Accepted Lead Time: 15~20 Days
Keywords: Modular Workforce Camps, Prefabricated Labour Colony, Temporary Dormitory House

Product Description

 

Prefabricated Workforce Lodging Prefab Steel House

 

More and more people are beginning to use steel structure materials as the first choice for construction.
Steel structure as a building material can make the frame of the house stronger.

Because wood is restricted in some areas, or the logging of wood is restricted locally,

environmental protection has become the local municipal government.


One of the main issues considered, and the Pre-Assembled Buildings solve this problem very well.
Steel often has the characteristics of good structural performance, lightweight, and high strength, thereby increasing the seismic performance.

In addition, steel, as a building material, can be recycled and is more energy-efficient and environmentally friendly than concrete.

These steel structure house frames are often processed and produced first in the factory.


The factory has production equipment to ensure the quality of the processing, achieve high precision, and greatly

extend the service life of the steel structure frame. Our company has a steel structure processing plant,

and we are a company that can produce Prefab Steel House.

 

All materials are processed in the factory, which reduces the on-site construction period, thereby saving labor costs,

and greatly reducing the requirements for construction.

There is basically no wet work in the on-site construction operation, and no dust, sewage, and other pollutants are generated.

It very environmentally friendly and energy-saving.

Prefabricated Workforce Lodging Prefab Steel House 0

Prefabricated Workforce Lodging Technical Specifications:

 

 Steel Column  2C80*40*1.5 painting
 Herringbone  Pre-welded C80*40*1.3/U50*35*1.3 electro-Galv.
 First floor main beam  C80*40*1.5/U50*35*1.2 electro-Galv.
 First floor secondary beam  C80*40*1.3 electro-Galv.
 Roof purlin  L40*3 electro-Galv.
 Ground channel steel  C80*40*1.3 electro-Galv.
 Steel staircase  Square tube 30*30*2.0/40*40*2.0, 2.5mm checkered plate painting
 Steel Corridor  1.8mm galv. steel plate/L40*3/tube 40*20*1.0 painting
 Roof panel  50mm/75mm/100mm Fiberglass/Rockwool/EPS sandwich panel
 Wall panel  50mm/75mm/100mm Fiberglass/Rockwool/EPS sandwich panel
 *Suspended ceiling (*Optional)  7.5mm gypsum board with frame
 First floor board  18mm plywood board
 *Floor leather (*Optional)  1.5mm PVC floor leather
 *Electrical system (*Optional)  Cable/Lights/Switch/Socket/PDB
 *Sanitary facilities&plumbing (*Optional)  Ceramic toilet/washbasin/shower, input & output pipes

 

 

Prefab Homes Steel Frame:

Prefabricated Workforce Lodging Prefab Steel House 1

Prefab Steel Home Foundation & Flooring:

Prefabricated Workforce Lodging Prefab Steel House 2

Prefab Steel Home Ceiling System:

Prefabricated Workforce Lodging Prefab Steel House 3

Prefab Steel Home Roof panel & Wall Panel:

Prefabricated Workforce Lodging Prefab Steel House 4

Prefab Steel Home Door and Window Units:

Prefabricated Workforce Lodging Prefab Steel House 5

Other Optional Facilities:
Electrical Fittings:
Electrical wire;
Socket;
Light;
Electrical distribution box;

Sanitary Ware & Plumbing:
Close tool;
Urinal;
Wash basin;
Shower head, Shower base;
Water drainage pipe.

Prefabricated Workforce Lodging Prefab Steel House 6

Get in touch with us

Enter Your Message

You Might Be Into These