Henan K-Home Steel Structure Co., Ltd.

Modular On-Site Temporary Prefabricated House

Product Details:
Place of Origin: Henan, China
Brand Name: KHOME
Certification: CE, ISO, SGS, PVOC
Model Number: KHPSH
Payment & Shipping Terms:
Minimum Order Quantity: 300 square meters
Price: USD30/m2~USD45/m2
Packaging Details: Loaded into 40ft shipping container
Delivery Time: 30 days
Payment Terms: L/C, T/T
Supply Ability: 30000 square meters/month
  • Detail Information
  • Product Description

Detail Information

Features: Lower Cost Material: Sandwich Panel+Light Steel Structure
Usage: Dormitories, Temporary Offices Manufacturer: Yes
Type: Prefab K Camp Fire Proof: A1grade
Wind Pressure: 100km/H Lifespan: 10~15 Years
OEM: Yes Lead Time: 15~20 Days, Even Longer
Keywords: Sloping Roof K House, Prefab Kit House, Panelized Kit Homes

Product Description

 

Modular On-Site Temporary Prefabricated House

 

Prefabricated Light Steel Frame Kit Homes is a house built with light steel.

The light steel material is a light steel keel made of hot-dip galvanized steel through cold rolling technology.

The architect has performed accurate calculations and supported and combined with accessories to achieve a synergistic force.

Bearing capacity to replace traditional houses.

 

Our company produces light steel houses, from design to production, as well as the purchase of corresponding accessories,

can be completed in our company. The light steel structure building technology originated from the wood structure

building technology in North America.

The house of this structure has the characteristics of flexible space, changeable shape, stable structure,

easy to manufacture, and diverse performance.
This technology is currently very popular in Japan, North America, South Korea, Australia, and is mainly used in

residential properties, shopping malls, schools, office buildings and other properties.

 

Usually Assembling Prefabricated Rooms have enough moisture-proof, breathable, heat-preserving and

earthquake-resistant capabilities. There is no difference in use with ordinary wood or cement buildings.

And because all the frames are pre-produced, it greatly reduces the time of on-site operations and reduces

a lot of construction costs for customers.

 

Modular On-Site Temporary Prefabricated House 0

 

Prefabricated Workforce Lodging Technical Specifications:

 

 Steel Column  2C80*40*1.5 painting
 Herringbone  Pre-welded C80*40*1.3/U50*35*1.3 electro-Galv.
 First floor main beam  C80*40*1.5/U50*35*1.2 electro-Galv.
 First floor secondary beam  C80*40*1.3 electro-Galv.
 Roof purlin  L40*3 electro-Galv.
 Ground channel steel  C80*40*1.3 electro-Galv.
 Steel staircase  Square tube 30*30*2.0/40*40*2.0, 2.5mm checkered plate painting
 Steel Corridor  1.8mm galv. steel plate/L40*3/tube 40*20*1.0 painting
 Roof panel  50mm/75mm/100mm Fiberglass/Rockwool/EPS sandwich panel
 Wall panel  50mm/75mm/100mm Fiberglass/Rockwool/EPS sandwich panel
 *Suspended ceiling (*Optional)  7.5mm gypsum board with frame
 First floor board  18mm plywood board
 *Floor leather (*Optional)  1.5mm PVC floor leather
 *Electrical system (*Optional)  Cable/Lights/Switch/Socket/PDB
 *Sanitary facilities&plumbing (*Optional)  Ceramic toilet/washbasin/shower, input & output pipes

 

Prefab Homes Steel Frame:

Modular On-Site Temporary Prefabricated House 1

Prefab Steel Home Foundation & Flooring:

Modular On-Site Temporary Prefabricated House 2

Prefab Steel Home Ceiling System:

Modular On-Site Temporary Prefabricated House 3

Prefab Steel Home Roof panel & Wall Panel:

Modular On-Site Temporary Prefabricated House 4

Prefab Steel Home Door and Window Units:

Modular On-Site Temporary Prefabricated House 5

Other Optional Facilities:
Electrical Fittings:
Electrical wire;
Socket;
Light;
Electrical distribution box;

Sanitary Ware & Plumbing:
Close tool;
Urinal;
Wash basin;
Shower head, Shower base;
Water drainage pipe.

Modular On-Site Temporary Prefabricated House 6

Get in touch with us

Enter Your Message

You Might Be Into These